Viaduct, Auckland
Structural engineering project involving the removal of existing glazing systems and design of new steel support framework for large LED displays. The engineering challenge required precise load calculations for wind forces and dynamic loads from the electronic displays. A new rooftop deck structure was designed and integrated with the existing building framework, requiring careful analysis of load paths and connection details to ensure structural integrity of the modified building envelope.
2021
Removal existing steelwork and glazing. New steel support structure for LEDs. Support framing for roof top deck
New support framework for large 4-sided LED screens
New support framework for large 4-sided LED screens